Customer safety is the focus
Imagine you are a professional chef who needs to prepare a menu for a celebrity chef who, with his insider knowledge, adamantly demands from you the best of the best. The demands on your skills would be very high. Experts from Dörries Scharmann, who have been working for 20 years with the maintenance and service department of energy company RWE Power AG, feel similarly. Their retrofit menus seem to be “tasty” to the specialists at the RWE Maintenance & Engineering Centre. Comprehensive modernisation of the fourth machine tool starts at the end of 2015.
“Because the product service initially develops directly at the customer, the level of success rises and falls with their participation,” says Günther Eller, head of “Customer Service”, describing the ideal situation (see the interview with Günther Eller on page 8). The result of a longlasting and successful business relationship is demonstrated the close cooperation of RWE Power AG in Frechen (near Cologne) with Dörries Scharmann Technologie GmbH (DST) from Mönchengladbach, a company of the Starrag Group.
The RWE Maintenance & Engineering Centre possesses four DST boring mills: two Scharmann WFT units, a Scharmann FB 100 from the 1970s, and a Scharmann Heavycut manufactured in 1983. “We began the fi rst complete overhaul and modernisation together with DST in 1996” says Willi Spelter, long-time employee within mechanical production and current project manager for machine tool maintenance. “A major retrofi t was then lined up in 2013 for both WFTs, due to serious damage to the guideways. For them to be replaced, the columns and headstocks had to be removed.” The experts at the RWE Maintenance & Engineering Centre brought in DST, due to previous good experiences. “It was clear to us that we would only be able to execute this project with the machine manufacturer,” reckons Spelter in retrospect. “We had to dig deep into the substance of the machines” adds Thomas Pfeiffer, head of the department for product-oriented maintenance. “Another factor was the fact that we could not do without the machines for long and that we had to complete the project with total reliability. And that is not possible without the manufacturer, who has all the necessary documentation at their disposal.”
Dörries Scharmann helped develop an initial maintenance strategy, the fi rst step of which grouped the boring mills into assemblies. “We depicted the 100-plus assemblies in a mind map and colourcoded them,” explains the project manager.
“ Accuracy and availability increased from two stars previously to fi ve stars.“
Green stood for “error-free”, yellow for “status still unclear” and red for “repair or replace”. Using this analysis, DST prepared an implementation plan with cost estimates. “RWE expected a detailed analysis, which was already a challenge for our project manager,” recalls Hans Jeschke, Director of Service for Dörries Scharmann Technologie. “We had to assess, explain, and justify each prospective retrofi t step – up to the point of future risks. However, it was the correct approach.” Based on this shared detailed analysis it was possible for both sides to draft a commercial contract with low risk, which accelerated the assignment. “We also considered purchasing new machines,” says Spelter. “In the end, the arguments in favour of a retrofit were not only the price, but also the fact that we wanted to continue using the basic machine substance.”
Uwe Herrmann interacts with the machines on a daily basis; the division engineer won’t let a bad word be said about the sturdy construction of the older Scharmann machines. “My experiences with both the completely overhauled production systems and those repaired previously have been very good,” emphasizes Herrmann. “I am certain that another retrofi t will be worthwhile, extending the machine life by another 15 or 20 years.” On average, the mechanical workshop simultaneously processes around 2500 RWE maintenance orders; in addition, it processes an increasing number of components for outside customers. The experts in Frechen are therefore reluctant to change to new machines, as processing ever-changing components in mostly small batches works best on proven production systems with known parameters and application options.
“All of us here in the Maintenance & Engineering Centre are maintenance personnel for the conveyor technology that RWE operates in the opencast lignite mines of the Rhineland,” explains department head Pfeiffer. “It is what defines our work from beginning to end.” Repair and maintenance operations are therefore very dynamic. “It is often not until Thursday that we decide what will be manufactured on a machine over the weekend,” says Pfeiffer. “Therefore, we expect respectively fast and flexible responses from external maintenance personnel.” Due to these diffi cult constraints, the Maintenance & Engineering Centre – in cases of boring mill retrofits – relies on a meticulously planned procedure in which it plays through many technical variants.
“This was a diffi cult period for us as suddenly only one of the three large boring mills was available,” says production engineer Herrmann. In order to make life easier for himself and his production team, the plan allowed for a progressive retrofi t. “The X-bed is shared by both machines, so to repair the linear guides, both moving columns had to be completely disassembled,” explains Pfeiffer. “We had the fi rst WFT partially repaired, so that it could be put back into use quickly.” The fi nal work on the partially repaired machine was done after the fi nal retrofi t of the other WFT. “The basic order was expanded several times and lasted approximately 16 months in total,” recalls Norbert Ophüls, Service Team leader for DST. “Nonetheless, the concurrent downtime of both boring mills was only six months.”
After the fi nal acceptance of both WFTs at the end of 2014, the mechanical overhaul of the Scharmann FB 100 (manufactured in 1972) began. The boring mill now features, among other things, the new direct-driven X-, Z-, B- and U-axes, which allow for reduced axial play and more precise positioning. Spelter: “As in the case of the WFT retrofi t, it proved benefi cial to proceed with maintenance in accordance with a well defi ned plan.”
„The intensive dialogue led to tailor-made solutions“
The retrofi t was followed by a modernization of the safety plan of both WFTs and the nearby Heavycut. “We also needed to reliably prevent any unnoticed access to the working area,” says production engineer Herrmann. “It was also important here to take into account that very large components sometimes protrude out over the working area.” The task was therefore also very challenging, as both of the WFTs are located on the same machine bed. Pfeiffer: “The intensive dialogue with DST then led to a tailor-made solution, which was also received well by the responsible regulatory authority and the employees.” One feature is the relatively low fence bordering the central corridor; with a height of one meter, it is only half as high as standard fences and allows for the protrusion of XXL components. “We fenced in all three ram boring mills completely,” explains Ophüls. “What’s more, there are pluggable partitions between the machines, which can be removed when handling very large components.” Finally, encrypted access control system with selective intervention in the emergency stop levels of the three machines safeguards against the unauthorised or unnoticed entry into danger areas.
But what, in the opinion of the RWE Maintenance & Engineering Centre, is the particular added value contributed by DST service providers – increasing effi ciency, revenue growth, enhancing safety? Pfeiffer did not want to estimate exact numbers – not least because of the small batch sizes and typical emergency repair operations. “For us, the technical availability of the system is the top priority,” replies the department head. “It has to be very high, so that the mechanical workshop can provide its service reliably. In order to keep the opencast mining conveyor technology available at all times for the coal supply, we are familiar with deploying a high level of effort and creativity that may be uncommon elsewhere in order to operate key production centres, such as our large boring mills, at maximum capacity at all times. That is why our skilled personnel, service providers and especially our technology must never leave us in the lurch.” With regard to orders that are not time-critical, the workshop must pay strict attention to effi ciency, i.e. to the lowest possible machine-hour rate, in order to secure the assignment. A recently performed benchmark analysis of the services of the entire location revealed that the boring mills for mechanical production are currently working very competitively.
„Particular added value for the RWE Maintenance & Engineering Centre: Increased effi ciency, revenue growth, enhanced safety“
All in all, the assessment of the boring mills retrofi t in Frechen can be represented on a scale ranging from one star (adequate) to a maximum of five stars (excellent). Spelter: “Accuracy and availability increased from two stars previously to five stars.” Due to the satisfaction with the DST retrofi t of the three machines, the retrofit of the Scharmann Heavycut will start in November 2015, a further development of the WFT series of ram boring mills. Ophüls: “The task will involve a comprehensive package including the overhaul of mechanical parts and the modernisation of electronics.” The Heavycut will receive – due in part to the discontinuation of components by sub-suppliers – a new Siemens Sinumerik 840D sl, switching system and wiring system, as well as new motors and measuring systems. Ophüls: “We will not proceed step by step with this assignment, but rather continuously with a basic order. In addition, RWE already budgeted for all possible options that may exist after disassembly.”
This elegant approach also enables RWE to avoid time delays resulting from renegotiations for extra tasks. After all, even if the product service is initially developed directly at the customer’s site, the level of success depends not only on their participation but also on prior exact planning.
Questions, Comments, Feedback?
I'll be happy to hear from you.
Contact-
© 2024 StarragTornos Group AG
- to Starrag main page
- Legal Notice
- Data Privacy